Opening a restaurant in Georgia: permits and plan review
- Pick what you need and give your kitchen's ZIP code.
- Each service goes to the number of local companies you choose, from one to five. We check licenses where the law requires one and email you their names.
- You talk with them and decide. You hire and pay the company directly.
Facts checked 2026-11-02.

Opening a restaurant in Georgia takes approval from the health office, the building office, the fire marshal and, in many places, the sewer utility. Each one has its own plans, forms and inspections, and local offices differ, so confirm each step with your own city or county. The sections below follow the order of the work, from the health plan review to the inspections before you open.
Food service permit and plan review
The Department of Public Health (DPH) writes the state food service rules, Chapter 511-6-1. The county health office applies them. Fulton County uses the Fulton County Board of Health. Gwinnett, Newton and Rockdale counties use GNR Health.
Rule 511-6-1-.02 requires plans and specifications for review when a food service is built, extensively remodeled, or converted from another use. They go to the county health authority at least 14 business days before construction, and the authority reviews them against DPH's manual for food service design, installation and construction.
The plans show:
- the proposed menu
- the floor plan and equipment arrangement
- mechanical plans
- construction materials and a finish schedule
- the type and model of fixed equipment
- the expected daily service volume
The permit comes after a complete application, the fee, approved plans and a preoperational inspection that shows the place was built or remodeled as approved.
A Fulton County Board of Health brochure adds that the health permit is "the first of many steps." A business license, a liquor license if you will serve alcohol, and zoning approval are separate. The brochure also says permits do not transfer between people or locations, so a new owner of an existing restaurant applies again. For a new building or a conversion of a space that was not a food service, the plan review is the full new-establishment type. An existing restaurant with a change of owner or a major remodel has its own review type.
Building permits
The state sets minimum building codes. From January 1, 2026, the Department of Community Affairs requires the 2024 International Mechanical Code with Georgia amendments, together with the 2024 building and plumbing codes. Cities and counties apply those codes and issue the permits.
In the City of Atlanta, applications go through the online permitting portal. Mechanical and plumbing plans are required uploads. Fulton County Health approval, a State Fire Marshal letter of approval and sewer capacity certification are also on the upload list. Files must be PDFs, since links to cloud drives are not accepted. The city asks for the physical state contractor license card, not just a printout from the Secretary of State.
In Gwinnett County, Planning and Development handles commercial construction, tenant certificates of occupancy, fire suppression systems and mechanical, electrical and plumbing trade permits. Applications and inspection requests go through the county's ZIP Portal.
A local company can take it from here. One form, free for restaurants.
Get connectedThe hood and fire protection
A commercial kitchen hood needs an automatic fire-extinguishing system under the Georgia fire code changes. The system must be installed by a firm licensed under Rule 120-3-23, using a permitted technician. The kitchen fire suppression guide covers licenses, tags and records.
The Safety Fire Commissioner's office does plan review for certain occupancies, and its plan review page says to upload through its portal. Other restaurants may go through the local fire marshal. Ask your fire marshal where yours goes. Gwinnett County's Fire Marshal handles inspections for new construction and high-risk occupancies through the ZIP Portal, and fire plans and operational permits are filed there too.
Georgia adopts NFPA 96 (2024 edition since May 2025) for hoods and ducts. More changes have been proposed, so check the current state rule. See the guide to hoods, ducts and exhaust.
The grease trap
If your kitchen needs a grease trap, ask the sewer utility what it wants to see before the plumbing permit. Atlanta's Department of Watershed Management, for example, wants floor plans that show the kitchen equipment and the tie-in to the sanitary line, plus trap specifications. See the grease trap guide.
Equipment on the plans
DPH's plan review asks for the type and model of fixed equipment. Rule 511-6-1-.05 says equipment must be commercial grade, and that equipment certified under a recognized American National Standard by an ANSI-accredited program is deemed to meet the rule's design standards when used as intended. The equipment guide has more.
Inspections before you open
Several inspections come before opening day. The health authority makes construction inspections for a new or extensively remodeled place and a preoperational inspection before it issues the permit. The building office inspects the permitted work. Atlanta lists fire protection among its inspection types and takes requests through its online portal, by email, phone or text. A request received before 3:00 p.m. is inspected within two business days. Keep the stamped plans on site, since the city expects them there.
Who to contact before construction
- Call the county health office and ask for the plan review packet.
- Get the commercial submittal list from the city or county permit office.
- Find out from the fire marshal where the hood and suppression plans go.
- Check with the sewer utility on whether you need a grease trap and what it wants to see.
- Hire licensed companies and check their license numbers with the agency that issued them.
The form passes a Georgia build-out request to the number of local companies you choose (one to five).
Questions
How early do I submit plans to the health department?
At least 14 business days before construction starts, under Rule 511-6-1-.02.
Does a new restaurant need a health inspection before opening?
Yes. The authority issues the permit after approving plans and completing a preoperational inspection.
Is the food service permit the only permit I need?
No. A Fulton County Board of Health brochure says it is the first of many steps. Business licensing, zoning and building permits are separate.
Can I transfer a food service permit to a new owner?
Permits do not transfer between people or locations, according to the same brochure.
Sources
- DPH food service page
- Georgia Rule 511-6-1-.02, plan review and permits
- Georgia Rule 511-6-1-.05, equipment and ventilation
- Georgia Rule 511-6-1-.10, inspections
- Fulton County Board of Health, Starting a Food Service Business
- GNR Health restaurant regulations and forms
- DCA 2026 code changes memo
- City of Atlanta online permitting
- City of Atlanta inspections
- Gwinnett County building services
- Gwinnett Community Risk Reduction
- OCI submit a safety fire plan
- Georgia Rule 120-3-3, State Minimum Fire Safety Standards (OCI PDF)
- City of Atlanta Grease Management Program